Project and construction insurance: an overview

A construction or installation project is concentrated risk: many parties, large values, tight deadlines – and the usual logic of annual policies isn't enough here. Project insurance is built for exactly this situation. This article is an overview; the in-depth content lives on the epites.biz specialist site.

In brief:
  • Construction-all-risks (CAR/EAR) insurance's base cover is the work under construction and the materials awaiting installation; the liability section for damage caused to third parties and the cover for construction machinery are typically available as separate sections or endorsements, each with its own limit – the specific content depends on the policy and its terms.
  • Who needs it? It can fall to either the investor or the contractor – the contract and the tender decide who takes it out.
  • When? Per project, or as an annual master policy for recurring work.

What is it, and what does it cover?

The backbone of project cover is the work under construction itself: damage occurring during the project to the completed structure, to materials awaiting installation, to scaffolding and to construction machinery. A liability element builds on this: damage caused by the works to a neighbour, a passer-by or utility infrastructure. Cover is tied to the project's timeline – it applies between the start and handover, and can be extended with testing-period and warranty-period add-ons.

Who needs it?

This is decided project by project, and typically the contract sets it out: the client expects it from the contractor, or the investor takes it out for the whole project, covering every party involved. As a contractor, this means that reading the tender and the contract for insurance requirements is part of the job – the insurance requirements of tenders and public procurement article covers this. The subcontractor chain deserves particular attention: who is working under whose cover.

When does it come up, and what should you watch for?

Typical moments: the start of a tender (with the required certificate of insurance), a larger investment of your own, or an unexpected project loss in the trade. Three things are worth watching: the cover should apply to the project's full value (underinsurance can bring proportional reduction here too), the period of cover should match the real schedule (extend it if there's a delay!), and the liability limit should meet the level required in the contract. On the relationship with the usual annual liability cover: professional and general liability overview.

Want to go deeper?

This article is deliberately an overview: the detailed information – covers, exclusions, practical examples – lives on the area's own specialist site.

On to: epites.biz →

A question tailored to your company? Book a free 20-minute consultation →

This article is for information purposes only and contains general information; it does not constitute an offer, or insurance, legal or tax advice. The specific covers, exclusions and pricing are set by the insurers' terms and conditions in force at any given time – it is worth going through these item by item when you request a quote. Updated: August 2026.

Related articles

Portfolio review in 20 minutes – bring your existing policies.

Free of charge and without obligation: I review what you have, and where there might be a gap or overlap – the decision is always yours.

Book a time